# Heat Pump Installation Marrero LA | New Ducted Systems

> First ducted heat pump installations and replacements for Marrero homes, with ducts, new circuits and the Jefferson Parish permit in one estimate. Ask us.

URL: https://sweetolivenolaheatpumps.com/service-areas/marrero/

Still cooling a Marrero house with window units and heating it with space heaters? We plan a first ducted heat pump from a room-by-room load, lay out the ducts, arrange the new circuits and handle the Jefferson Parish permit, all in one written estimate.

Heat pump on a stand beside the rear steps of a raised Marrero house.

## What brings Marrero homeowners to us

### Window units in every room

Three or four units run all summer, the back rooms never catch up and the house never feels dry. You want one system that reaches everywhere.

### A raised house with open space below

The floor sits on piers. Where the equipment and ducts go, attic or underneath, is the first decision we make together.

### An old system on its last summer

The house has central air already and it is failing. You want the replacement sized properly, not copied from the old label.

### The panel is a question mark

You aren't sure the panel can carry a heat pump and its heat strip. We check it before the equipment is chosen.

Last updated: November 18, 2026

Three window units hum all summer, the kitchen and the back bedroom never cool, and the space heaters come out every January. You’d like one system for the whole house, and you want to know what it takes in a Marrero home.

[Sweet Olive](https://sweetolivenolaheatpumps.com/) installs ducted air-source heat pumps in homes across Marrero and the rest of [our service area](https://sweetolivenolaheatpumps.com/service-areas/), including houses that have never had ducts. A first system is a bigger job than a swap: the ducts, the return, the new circuits and the spot for the outdoor unit are all new decisions. So on the first visit we measure each room, look in the attic and under the floor, and check the panel. Your written estimate lays out the equipment, the duct layout, the electrical work and the Jefferson Parish permit steps.

If your house already has central air that is failing, the [replacement page](https://sweetolivenolaheatpumps.com/heat-pump-replacement/) fits better. For a house with no system yet, [new installation](https://sweetolivenolaheatpumps.com/heat-pump-installation/) covers the full process.

## Inside a first ducted heat pump in Marrero

Window units, space heaters and a raised floor with room underneath: why this Marrero installation kept the equipment up in the attic.

- **Location**: Marrero, north of the Westbank Expressway
- **Home**: Raised single-story frame house, about 1,300 sq ft, three bedrooms
- **System**: Nominal 2-ton two-stage ducted heat pump
- **Ductwork**: 7 attic supply runs, 1 hall return, 2 jumper ducts
- **Electrical**: Two new 240-volt circuits and a disconnect
- **Outdoor unit**: Raised stand beside the rear steps
- **Project price**: $10,950
- **Duration**: 4 working days

The house

### Window units and a crawlspace

The house was a raised frame home in Marrero, north of the Westbank Expressway, about 1,300 square feet with three bedrooms. Three window units cooled it, space heaters warmed it, and it had never had ducts. The floor stood on piers with about thirty inches of open space underneath, and the attic was reached through a hatch in the hall ceiling.

The decision

### Up in the attic, not under the floor

Ducts and an air handler under the floor were one option, and the crawlspace looked convenient. We put the equipment in the attic instead, because the space under the house was damp, tight to work in and the first place water got to in a heavy storm, and heating and cooling equipment was never built to sit in floodwater. The load calculation supported a nominal two-ton, two-stage system.

- **Each room**: windows, sun and ceiling height for the load calculation
- **Attic opening**: headroom and joists
- **Return location**: where a central return can draw air
- **Electrical panel**: rating, open spaces and existing load
- **Outdoor spot**: footing and drainage
- **Thermostat**: on an inside wall

The first visit in plan: the rooms, the attic opening, where a central return can draw air, the panel, the outdoor spot and the thermostat wall.

The work

### Four days from hatch to startup

On day one we widened the hall hatch within one joist bay, built the attic platform and set the air handler over a secondary pan with a float switch. On days two and three we ran seven insulated supply runs to ceiling registers, a central return in the hall ceiling and two jumper ducts from the back bedrooms, cutting each opening under dust sheeting. An electrician added two 240-volt circuits and the disconnect while we set the outdoor unit on a stand beside the rear steps.

The result

### Window units out, readings in

On day four we ran the line set, the nitrogen pressure test and the evacuation, then checked the charge, airflow, static pressure and the drain. We set the thermostat and left the readings. The window openings were closed back up, and the parish inspection followed. The aim was every room on one system, with the dry-out of long, steady runs.

## Attic or under the floor?

On a raised house, the first decision is where the equipment and the ducts live.

Attic

Air handler on a platform, ducts to ceiling registers, return in the hall ceiling.

- Up out of reach of standing water
- Needs a secondary pan and float switch
- Headroom and hatch size decide the cabinet

Under the floor

Air handler and ducts in the space below, with floor registers.

- Easier to reach some rooms
- Damp, tight space to work and service
- First place water reaches in a storm

Where the attic has room, we plan there first and keep the equipment off the ground.

### Why we keep equipment up

Heating and cooling equipment isn’t built to sit in floodwater, and the space below a raised floor is where water arrives first. An attic air handler sits over a secondary drain pan with a float switch, so a blocked drain shuts the system off instead of staining a ceiling. The outdoor unit goes on a stand where the yard holds water, after we check the parcel’s requirement. The [placement guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-outdoor-unit-placement/) shows the options.

### Returns that every room can reach

Each bedroom needs a way for its air to get back to the return, not just a supply register. We lay out a central return and add jumper ducts where closed doors would otherwise trap the air. The [ductwork guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-ductwork/) explains the layout.

An outdoor unit on a raised stand beside a raised house's steps.

## Sizing a house that's never had central air

With no old nameplate to copy, the load calculation does all the work.

- **Air handler**: on an attic platform, over a secondary drain pan
- **Supply runs**: dropping to ceiling registers
- **Central return**: in the hall ceiling
- **Jumper duct**: from a closed bedroom to the hall
- **Line set and drain**: along the outside wall
- **Outdoor unit**: on a raised stand, with its disconnect

A first ducted system in section: attic air handler over its pan, ceiling registers, a hall return, a jumper duct and the outdoor unit on a stand.

### Room by room

We run a room-by-room load calculation (ACCA Manual J) from your windows, walls, ceiling and air leaks, then lay out the ducts from those room loads. A house cooled by window units has no record of what a central system needs, and adding up the window units’ sizes doesn’t give one. Oversized equipment cools fast and leaves the air damp; the [sizing guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-sizing/) explains why.

### Backup heat for the cold snaps

Winters here are short, but cold mornings still come. A small electric heat strip in the air handler covers those hours and the defrost cycle, sized from your heating load rather than the largest strip the cabinet accepts.

The electrical side of a first system

- **The panel.** Rating, open spaces and what already runs on it.
- **New circuits.** One for the outdoor unit and one for the air handler’s heat strip, added by an electrician.
- **The disconnect.** A shut-off within sight of the outdoor unit.
- **A panel upgrade.** Only if the load check calls for it, and priced as its own line.

The [electrical readiness guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-electrical-readiness/) covers the checks in more depth.

A technician at an outdoor unit, the end of the new circuit and disconnect.

## Permits in Marrero

Marrero is one of the larger West Bank communities, and it has no city government of its own.

Installing heating and cooling equipment in Marrero is filed with the Jefferson Parish Building Regulatory Division before the work, and inspected afterwards. [Harvey](https://sweetolivenolaheatpumps.com/service-areas/harvey/) to the east and [Estelle](https://sweetolivenolaheatpumps.com/service-areas/estelle/) to the south go to the same office; Westwego to the west is a separate city, so a Westwego address gets checked first. Your estimate states who obtains the permit, and the [permit guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-permits/) compares the offices. We confirm the electric account for the address at the same visit.

## What a first system costs in Marrero

A first installation includes parts a replacement reuses, and the estimate shows each one.

**Sweet Olive's typical range for a residential ducted heat pump installation is $4,250 to $11,750.** We set your price after the site visit and write it into your estimate line by line, with the duct layout, new circuits and the Jefferson Parish permit steps shown separately.

| Line on the estimate | First installation | Replacement |
| --- | --- | --- |
| Supply and return ducts | New, laid out from the room loads | Tested; reused where sound |
| Ceiling or wall openings | Cut for every register and grille | Usually already there |
| Circuits and disconnect | New | Often reused after a check |
| Air handler platform and pan | New | Rebuilt if needed |
| Window units and openings | Removed and closed as the estimate states | Not applicable |

What a first installation adds compared with a replacement, line by line.

The [installation process guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-installation-process/) walks through the work days, and the [cost guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-cost/) breaks a price into its parts. If you’re weighing a system without ducts, our [ducted versus ductless guide](https://sweetolivenolaheatpumps.com/guide/ducted-vs-ductless-heat-pumps/) explains why we install ducted systems.

## How a Marrero job usually runs

Five steps, with the duct layout and the circuits planned before any equipment is ordered.

1. Tell us about the house How it is cooled and heated now, which rooms suffer most, and the address. Photos of the panel and the attic hatch help.
2. We visit and lay it out Each room for the load calculation, the attic and the space below the floor, the panel, the return location and the outdoor spot.
3. Your written estimate Equipment, the duct layout room by room, new circuits, the parish permit steps and exclusions, priced line by line.
4. Filing, then the work days The permit is handled as your estimate states, then the work days are booked with each room protected as openings are cut.
5. Startup and inspection Pressure test, evacuation, charge, airflow, drain and thermostat, with the readings left with you before the parish inspection.

## Around Marrero

Permits: Jefferson Parish. Electric service: Entergy Louisiana, confirmed for your address.

Neighborhoods

- North of the Westbank Expressway
- Along Barataria Boulevard
- Off Ames Boulevard
- Near Lapalco Boulevard

Landmarks

- West Jefferson Medical Center

Main routes

- Barataria Boulevard
- Ames Boulevard
- Westbank Expressway
- Lapalco Boulevard

Marrero and the communities around it that we serve. [Open the area in Google Maps](https://www.google.com/maps/search/?api=1&query=Marrero%2C%20Louisiana)

## Questions from Marrero

### Can the ducts run under a raised Marrero house instead of through the attic?

They can, and on some houses the attic leaves no other choice. We plan the attic first where it has room, because the space under a raised floor is damp, tight to work in and the first place water reaches in a heavy storm. Where ducts must go below, we insulate and support them and keep the equipment itself up out of reach.

### How much is a first ducted heat pump in a Marrero house with window units?

Our typical range for a residential ducted heat pump installation is $4,250 to $11,750. A first system with all-new ducts tends to sit toward the upper part of it, and the number of rooms, attic access and new circuits decide where. We set your price after the visit and write it into the estimate line by line.

### Is a Westwego address handled the same way as a Marrero one?

Not necessarily. Marrero is unincorporated Jefferson Parish, so its permits go to the parish. Westwego, to the west, is a separate city, so we confirm the permit office for a Westwego address before the estimate is written.

### What happens to the window units after a Marrero installation?

Your estimate states who takes the units out and how each window or wall opening is closed again, so nothing is left to guess on the last day. Wall sleeves usually need more work than a window that simply closes, and we note each one on the first visit.

### Can one ducted system serve the whole house, including a back addition?

Usually, if the ducts can reach it and the load calculation includes it. An addition with its own sun and insulation adds load, and a long run to reach it needs the right size. We plan every room into the layout; we don't install ductless mini splits, so a room the ducts can't reach is a conversation we have at the visit.