A commercial unit that keeps failing, or no longer keeps up with how the space is used? We test what is there, decide what stays connected, plan the lift and the downtime around your business, and price the replacement in one written estimate.

New heat pump on a galvanized stand on the flat roof of a Carrollton office building.

- Replacement of ducted commercial heat pumps
- Same size is checked, never assumed
- Priced per project
- Downtime planned before delivery day

Last updated: November 18, 2026

Commercial heat pumps rarely give out at a convenient time, and replacing one means more than a new cabinet. The roof or ceiling it sits in, the ducts and controls it connects to, and the space that loses cooling while the work happens all shape the job.

[Sweet Olive](https://sweetolivenolaheatpumps.com/) replaces ducted air-source heat pumps in offices, shops, restaurants and small multi-tenant buildings [across New Orleans](https://sweetolivenolaheatpumps.com/service-areas/). We test what is there, decide what stays connected, plan the lift and the downtime, and price the whole replacement as one written estimate.

If the unit may still be worth fixing, start with [commercial repair](https://sweetolivenolaheatpumps.com/commercial-heat-pump-repair/). If the building is changing from gas heat or another type of system, that is a [commercial retrofit](https://sweetolivenolaheatpumps.com/commercial-heat-pump-retrofit/). For a house, see [residential replacement](https://sweetolivenolaheatpumps.com/heat-pump-replacement/).

## Inside a Carrollton office replacement

A worn front-office system on rotting roof sleepers, a sound one at the back, and an office that had to stay open: replacing one unit, not two.

Before

After

- **Location**: Carrollton, New Orleans
- **Property**: One-story office building, about 2,200 sq ft, flat roof
- **System**: Nominal 4-ton split heat pump replaced; second system kept
- **Ductwork**: Existing ducts kept after a leakage and static-pressure test
- **Roof support**: Galvanized steel stand replacing soft wood sleepers
- **Line set**: 35 feet, new
- **Project price**: $12,980
- **Duration**: 2 working days

The building

### Two systems, one of them worn out

A one-story office building near Oak Street ran two split heat pumps: a four-ton system for the open front office and a three-ton system for the private offices at the back. The front system was worn, its outdoor unit sat on the flat roof on wood sleepers that had gone soft, and its air handler hung above the corridor ceiling. The tenant needed the front room back without closing the office.

The decision

### Both tested, one replaced

We tested both systems before pricing either. The back system's readings were sound, so it stayed; replacing both at once was the alternative we priced for comparison. The load calculation for the front office, with its staff, printers and west windows, still supported four tons. The duct test showed a tight trunk, so the ducts stayed, and the soft sleepers gave way to a galvanized steel stand that held the unit clear of the roof membrane.

The two working days: removal and placement on day one, connections, testing, setup and handover on day two.

The work

### Staff moved to the back for two days

On day one the staff worked from the back offices, which kept cooling. We protected the corridor, recovered the refrigerant, took the old units out and lifted the new outdoor unit to the roof from the rear parking lot on a rented material lift. On day two we ran a new 35-foot line set through the existing roof penetration, brazed under nitrogen, pressure-tested and evacuated to a micron reading, then reflashed the penetration and connected the new air handler to the existing plenum.

The handover

### Readings for the tenant, a note for the landlord

We set airflow for the existing ducts, tested the drain and float switch, and programmed the thermostat to the office's hours. The tenant got the startup readings and equipment records; the landlord got a note on the back system's age and condition for planning. The front office came back on line without the business closing for a day.

## When it's time to price a replacement

Age alone doesn't decide it. These are the signs that a replacement price is worth having next to the repair.

- **A compressor or coil failure on an aging unit.** The biggest repairs on the oldest equipment.
- **Repeat repairs on the same system.** Each fix is reasonable; the total isn’t.
- **A space that has changed.** More people, longer hours or new equipment than the unit was sized for.
- **Slow refrigerant leaks that keep coming back.** Recharging treats the symptom.
- **A unit that can’t hold temperature on hot afternoons** even after repairs and cleaning.

A technician recording an outdoor unit's details before any decision is made.

### Lifespan is a range, not a date

A well-kept unit can outlast a neglected one by years, and a young unit can fail early from a blocked drain or poor airflow. We weigh age, repair history, the condition of the coil and compressor, and how the space is used now, and we tell you which of those is driving the recommendation. Our [repair-or-replace guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-repair-or-replace/) works through the decision.

## What we check before choosing the new equipment

The new unit has to fit what stays connected to it, so we test each connection first.

| What we check | What it decides |
| --- | --- |
| The load, from the space as it is used now | Capacity, and whether one system or several fits better |
| Duct leakage and static pressure | Whether the ducts carry the new airflow, need sealing or need changes |
| Line set size, route and condition | Reuse against the manufacturer’s limits, or a new line set |
| Roof stand, curb or pad | Reuse, or a new support sized and levelled for the new cabinet |
| Circuit, breaker and disconnect | Whether they match the new nameplate |
| Thermostat and control wiring | Support for the new stages, backup heat and schedule |
| Drain, pan and float switch | Keeping water off the ceiling below |

The parts of the existing system we check, and what each check decides.

### Same size isn't proof of the right size

Nominal tonnage on an old nameplate tells us what was installed, not what the space needs. A load calculation adds up the glass, walls, roof, people, equipment and lights as they are now. Variable-speed equipment can follow a swinging load better than single-stage, at a higher price; our [comparison guide](https://sweetolivenolaheatpumps.com/guide/single-stage-vs-variable-speed-heat-pumps/) and [sizing guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-sizing/) go further, and the [ductwork guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-ductwork/) explains the duct tests.

## Getting the old unit out and the new one in

Access is the part of a commercial replacement most likely to change the plan, so we solve it before delivery day.

### Lifts, hatches and the route

Roof units come down and go up by a rented material lift, a crane or a roof hatch, depending on the building and the weight. Where a crane or structural work is needed, it goes into the scope with its own line. Air handlers above a ceiling need tiles out and a clear path below, and we protect the floor and the route through occupied rooms.

### A set place for the downtime

We agree which spaces lose cooling, on which days, who provides access and who can approve decisions while we work. Where a second system serves part of the building, staff can often move into its rooms for the day. The price and the work days follow that plan.

A one-story commercial building, with the side yard as the route to its outdoor equipment.

## From removal to startup

A replacement runs in a fixed order, because each stage depends on the one before it.

### Recovery and removal

The refrigerant is recovered from the old system before anything is disconnected. The old outdoor unit and air handler come out by the planned route, and the support and penetrations are checked once they are bare.

### Placement and connections

The new outdoor unit goes on its stand or pad and the air handler connects to the plenum, drain and circuits. Line-set joints are brazed under nitrogen, then the piping is held under nitrogen pressure and evacuated to a micron reading before refrigerant goes in. Roof penetrations are resealed or reflashed.

The startup checks every replacement passes before the thermostat is handed over.

A wall control programmed to the space's hours and the new equipment's stages.

### Startup and commissioning

At startup we measure airflow and static pressure and set the blower for the existing ducts, verify the charge, test the drain and float switch, and confirm the heat strip and defrost. The thermostat is programmed to your hours. The readings go on the startup record, the baseline for every later [maintenance visit](https://sweetolivenolaheatpumps.com/commercial-heat-pump-maintenance/).

## What moves a replacement price

We price each commercial replacement from the equipment, the building and the access the work needs.

**We price commercial heat pump work per project, from the equipment, the building and the access the work needs.** We set your price after the walk-through and write it into your estimate line by line, so you can see what each part of the replacement adds.

The lines that change most

- **Capacity and efficiency tier.** Two-stage and variable-speed equipment costs more than single-stage.
- **What stays.** Reused ducts, line set and support lower the price; each one that fails its check adds a line.
- **The lift.** A material lift, a crane or a long carry.
- **Roof work.** New stands, curbs and flashing.
- **Electrical changes.** A different breaker or disconnect, or added capacity.
- **Number of systems** replaced at once, and the hours the work has to fit.

### Running cost and incentives

Higher SEER2 and HSPF2 ratings lower electricity use at the same load, and over a long cooling season that difference adds up in a building that runs all day. It can’t make up for an oversized unit or leaky ducts. Utility incentives depend on the account type and the program’s current terms, so we check them for your account before any figure goes into a budget. Our [operating cost guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-operating-cost/) and [cost guide](https://sweetolivenolaheatpumps.com/guide/heat-pump-cost/) explain both.

## What a commercial replacement includes

Your written estimate lists each of these for your building, and names anything we leave out.

- A check of the existing load, ducts, line set, supports, electrical supply and controls
- The load calculation and the new equipment that follows from it
- Refrigerant recovery and removal of the old equipment
- The lift, hoist or carry that gets equipment in and out, and protection along the route
- New outdoor unit and matched air handler, with the backup heat the load calls for
- A new or reused line set, stand or pad, as the checks decide
- Reconnection to the ducts, drain and circuits, with a secondary pan and float switch where the air handler sits above a ceiling
- Pressure test, evacuation, charge, airflow setup and a scheduled thermostat
- The permit and inspection steps for the address
- Startup readings, equipment records and disposal of the old equipment

## Like-for-like swap, resized replacement or a retrofit

Three answers to a worn-out commercial heat pump. The right one depends on what the walk-through finds.

*Like-for-like replacement, resized replacement and retrofit compared*

| Approach | What changes | When it fits | What to plan for |
| --- | --- | --- | --- |
| Like-for-like swap | New equipment of the same capacity on the same ducts and supports | The load calculation confirms the old size and the ducts test sound | Line set and supports still have to pass their own checks |
| Resized replacement | A different capacity, or several systems where there was one | The space, its hours or its equipment have changed | Duct changes, different circuits and a new support |
| Retrofit | A different type of system, such as heat pumps in place of gas furnaces | The building is changing how it heats | Gas, electrical and venting work, covered on our retrofit page |

The old unit's size is where we start, not where we finish. If the load calculation and the duct test back it, a like-for-like swap is the simplest job; if they don't, we show you why before you commit.

## How a commercial replacement runs

Six stops from your first message to the handover.

1. Tell us about the system Photos of the unit labels, the spaces it serves, its repair history, access details and who approves work.
2. Walk-through and tests Load, ducts, line set, supports, electrical supply and controls, checked against what the new equipment needs.
3. Your written estimate Equipment, what stays and what changes, the lift, the downtime plan, permit steps and exclusions, priced line by line.
4. Permit, order and schedule The permit is handled as the estimate states, equipment is ordered, and the work days are set around the business.
5. The work days Recovery and removal, then placement, connections, pressure test and evacuation.
6. Startup and handover Charge, airflow, drains and the thermostat schedule, with the readings and equipment records for the property file.

## Questions we hear about this work

### Should a commercial unit be replaced with the same size?

Only if the load calculation says so. A new tenant, longer hours, more staff, new kitchen equipment or added glass can all change the load since the old unit went in, and some units were oversized from the start. We size from the space as it is used now and show you the result, whether it matches the old nameplate or not.

### Do we have to replace every unit in the building at once?

No. Each split system stands on its own, so a sound unit can keep running while a worn one is replaced. We test them all before pricing, and if several are near the end of their life, we price replacing them together and one at a time so you can weigh the cost against the disruption.

### Can the existing ducts and roof stand be reused?

Often, once they pass. Ducts are tested for leakage and static pressure against the airflow the new equipment needs. A roof stand or pad has to be level, sound and the right size for the new cabinet, and wood sleepers that have gone soft are replaced. Each decision is written into the estimate.

### How long is the space without cooling during a replacement?

For a single split system, plan on about two working days, with the affected space losing cooling from the morning of the first day until startup on the second. Other systems in the building keep running. A crane lift, duct changes or several systems add time, and your estimate sets out which spaces are affected on which days.

### Why do two commercial replacement quotes differ so much?

They often price different jobs. One may include the lift, a new line set, a steel stand, roof flashing and a scheduled thermostat; another may leave them for later. Ask each to name what is removed, what is reused, how the equipment reaches the roof or yard and what happens at startup, then compare like with like.